Continuous experience with City of Los Angeles since 1990,
CADSTAR has provided requirement analyses, strategic
system planning, annual budget forecasting, deployment
management, user training, and graphic and technical support
for BOE’s Wastewater Program.
Played an active roll in the City of L.A.'s Environmental
Engineering Division's successful effort to distribute major
construction projects on CDROM for the Bid process.
Developed the Graphical Interface utilized for the LA
Wastewater Control Systems Replacement Program for BOS.
Provided On-Site Mechanical Design Services
•
Trouble shooting piping interference’s
•
Interfacing with construction contractors
Assisted in the analysis and documentation of the Wastewater
Construction Process as well as the development of flowcharts
for the Bid and Award Contract Process.
CITY OF LOS ANGELES
In 2004, as part of the Green Port initiative, CADSTAR was
contracted to provide an organized, paperless process for
RFP and contract document distribution.We provided a
customized autorun solution delivered on CD/DVD formats
that has significantly reduced the cost of contracting,
improved cycle times for distribution, and received
numerous compliments from vendors. CADSTAR continues
to provide the POLB with custom services for Specification
(RFP) distribution and Conformed Specifications.
Port of Long Beach
Past Projects
CADSTAR is currently listed on the BOS and BOE On Call list as a sub-consultant.