Continuous experience with City of Los Angeles since 1990,  CADSTAR has provided requirement analyses, strategic  system planning, annual budget forecasting, deployment  management, user training, and graphic and technical support  for BOE’s Wastewater Program.  Played an active roll in the City of L.A.'s Environmental  Engineering Division's successful effort to distribute major  construction projects on CDROM for the Bid process. Developed the Graphical Interface utilized for the LA  Wastewater Control Systems Replacement Program for BOS.  Provided On-Site Mechanical Design Services  Trouble shooting piping interference’s Interfacing with construction contractors Assisted in the analysis and documentation of the Wastewater  Construction Process as well as the development of flowcharts  for the Bid and Award Contract Process.

CITY OF LOS ANGELES

In 2004, as part of the Green Port initiative, CADSTAR was  contracted to provide an organized, paperless process for  RFP and contract document distribution.We provided a  customized autorun solution delivered on CD/DVD formats  that has significantly reduced the cost of contracting,  improved cycle times for distribution, and received  numerous compliments from vendors.  CADSTAR continues  to provide the POLB with custom services for Specification  (RFP) distribution and Conformed Specifications.

Port of Long Beach

Past Projects

CADSTAR is currently listed on the BOS and BOE On Call list as a sub-consultant.
Index Projects Dbe Sbe Projects